Service Areas

Concrete Contractor in St. Louis Park, MN

A published permit fee that comes to two hundred ten dollars, and a postwar plat where the Village approved lots thirty to forty feet wide. Driveways, stamped patios, walks and poured walls.

St. Louis Park publishes its permit fee, so we can tell you what the paperwork costs before we start. The city requires a permit for any work in the public right-of-way, and it states plainly that this includes work in the street, the boulevard and the sidewalk, and that any work above or below ground in the street right-of-way requires a permit, driveways specifically named.

The department is Engineering, through its Engineering Permits division. The city lists Kerrwin Dempsey, Engineering Technician, at 952.924.2549 and kdempsey@stlouisparkmn.gov, with a general engineering line at 952.924.2656. We found no separate curb cut permit sitting on top of this. The public right-of-way permit is the driveway permit.

The fee is published: one hundred thirty-five dollars for installation or repair of sidewalk, curb cut or curb and gutter, plus a seventy-five dollar administrative fee applied to all permits, for two hundred ten dollars total. That is the city's number, current as of our research, and we would still have you confirm it at application rather than treat a web page as a receipt.

St. Louis Park is in Hennepin County, so footings go to forty-two inches below finished grade under Minnesota Rules 1303.1600, Zone II, absent an engineer's soil mechanics determination allowing a shallower depth. We pour driveways, stamped patios, walks, steps, garage slabs, footings and foundation walls throughout the city, and we pump, which on these lot widths is not optional.

Permit terms, narrow lots and postwar concrete

The permit conditions in St. Louis Park are specific and they shape how a job gets scheduled, so they belong in your quote conversation rather than in a surprise phone call. A permit is valid for six months from issuance. The contractor has to give the city at least forty-eight hours notice before starting work. Inspections have to be scheduled at least forty-eight hours in advance, and they happen on weekdays between 7:30 in the morning and 3:30 in the afternoon. And pavement repairs carry a minimum two year guarantee from the date of inspection.

Those terms are the reason we will not tell a St. Louis Park homeowner we can start Monday when you call on Friday. Two forty-eight hour notice windows sit between the permit and a finished, inspected apron, and the inspection window is a business day window. Planning around that is part of the job, and it is one more argument for booking a driveway over the winter rather than in June when everybody else has decided the same thing.

On dimensions there is a gap, and we would rather name it than fill it. The city's engineering permit pages and its right-of-way FAQ cover process, fees and inspection terms, and they do not publish a residential driveway width, a property line setback or an apron construction standard. So we do not tell you the maximum width is some number we read somewhere else. We ask Engineering for your address before we form, and we build to what they tell us.

What makes St. Louis Park physically distinctive is lot width, and the reason is history. The city's historical society records a postwar building boom running primarily from 1946 to 1954, states that around sixty percent of the city's homes were built in that period, and notes that the Village approved lot sizes of thirty to forty feet to make large scale postwar development economical. That is a local historical society rather than a government statistical source, so treat the numbers as their account rather than as a census figure. But the lot widths are visible from the street, and they are the single biggest practical factor in how we work here.

A lot that width usually means a single width driveway running the depth of the property, a side yard too narrow for a machine, and a neighbor's foundation a few strides from your forms. Every part of that changes the plan. Tear out has to come out the way it went in. Protection matters for the neighbor's turf as much as for yours. And a backyard patio behind a house on a lot that width is a pumped pour or it is nothing, which is exactly why we own the pump rather than rent access to one.

The concrete itself is at the age you would expect from that era, and the failures are the familiar ones. Frost heave where the base was thin or never drained, so panels tip and the slab stops shedding water. Joints that opened wide enough to stop controlling anything and now just collect water and salt. Aprons crumbled at the street. And scaling across the surface, where decades of de-icing chemical have taken the top skin off. None of that is fixed by pouring new concrete on top of it.

There is a positive to a narrow lot that nobody mentions. The driveway is a smaller pour than a suburban one, which means the money goes further into the parts that decide how long it lasts: a properly excavated subgrade, an aggregate base built up in lifts rather than dumped in one pass, honest thickness at the apron where the loading is worst, and joints saw cut on time and to depth so cracking goes where you cannot see it. On a narrow lot that is an affordable upgrade rather than a luxury.

We also do a good deal of walk and step work here, because the front walks are the same age as the driveways and the front steps we are called out to are often sitting on a pad rather than on footings that reach frost depth. If a stoop has separated from the house or tipped away from the door, that is what it is telling you, and rebuilding it on footings carried down below frost is the difference between fixing it and doing it again.

What we pour in St. Louis Park

  • Single width driveway tear out and replacement on narrow postwar lots
  • Curb cut, apron and curb and gutter work under the city right-of-way permit
  • Stamped patios placed by pump behind houses with no usable side yard access
  • Front walks, steps and stoops rebuilt on footings carried below frost
  • Detached garage slabs, aprons and rear parking pads
  • Poured footings and frost walls for additions, garages and porches
  • Sidewalk panel replacement tied into a driveway or apron job
  • Exposed aggregate and broom finished flatwork, tear out and haul away included
What we pour in St. Louis Park

Every concrete service, one local crew

Stamped Concrete Patios

Stamped patios in the patterns and colors you actually want, poured with the base, jointing and sealer that keep them looking right season after season.

Learn more

Concrete Driveways

New driveways and full tear out and replacement. Proper base, proper thickness, joints cut where they belong, so it does not crack the way the last one did.

Learn more

Poured Walls & Foundations

Foundation walls, footings and frost walls for new builds, additions and garages, formed and poured to the depth Minnesota code requires.

Learn more

Concrete Pumping

Backyards, basements and anywhere the truck cannot back up to. Line pumping so the pour reaches the form instead of the wheelbarrow.

Learn more

Sidewalks & Steps

Walks, front steps, stoops and garage aprons. The small pours people put off, done with the same base work and jointing as the big ones.

Learn more

Pole Buildings

Concrete floors poured inside pole buildings and pole barns, plus the aprons in front of the doors. Compacted base, rebar throughout and saw cut joints.

Learn more

New Construction Homes

Basement floors, garage floors, slabs, sidewalks and driveways on new homes, poured to the builder's schedule by the crew that did the footings.

Learn more

Concrete Resealing

Cleaning, patching and a fresh coat of sealer on stamped patios, driveways and walks, so an older slab goes back to looking like the one you paid for.

Learn more

Concrete Countertops

Custom poured countertops, bar tops and vanities, taken on between flatwork jobs. Call to see what the schedule looks like.

Learn more
St. Louis Park questions

Good to know

Do I need a permit to replace my driveway in St. Louis Park?

Yes. The city requires a permit for any work in the public right-of-way, and it names driveways specifically. It is handled by the Engineering Department through Engineering Permits. We found no separate curb cut permit on top of it. The right-of-way permit is the one.

What does it cost?

The city publishes it: one hundred thirty-five dollars for installation or repair of sidewalk, curb cut or curb and gutter, plus a seventy-five dollar administrative fee that applies to all permits, so two hundred ten dollars total. Confirm it at application, since a fee schedule can change.

How fast can you start?

Slower than you would like, and the reason is in the permit terms. The contractor has to give the city at least forty-eight hours notice before starting, and inspections have to be scheduled at least forty-eight hours in advance and happen weekdays between 7:30 a.m. and 3:30 p.m. A permit is good for six months from issuance. That is a real schedule, and we plan around it rather than promise past it.

Is there a warranty on the street work?

The city requires that pavement repairs be guaranteed for a minimum of two years from inspection. That is a condition the city places on the permitted work. Ask us and ask every bidder what they stand behind beyond that, and get the answer in writing rather than in conversation.

How wide is my driveway allowed to be?

We do not know, and neither does anyone quoting you a number confidently. The city's engineering permit pages and right-of-way FAQ cover process, fees and inspection terms, and do not publish a residential driveway width or setback standard. We ask Engineering about your specific address before forming. It is a short phone call and it beats guessing.

My lot is narrow and there is no way to get a truck to the back. Can you still pour a patio?

Yes, and on these lot widths it comes up constantly. We run our own line pump, so concrete travels by hose down a narrow route to the back and the mixer truck never leaves the street. Here that is the normal method rather than the exception.

Why does my driveway have panels that tip when it rains?

That is usually frost heave working on a base that holds water. Ice lifts one part of the slab and not another, and after a few winters the panels sit at slightly different elevations and the driveway stops draining. The fix is under the slab, in a compacted aggregate base of consistent depth over a properly prepared subgrade, not in a thicker pour on the same ground.

My front stoop has pulled away from the house. What causes that?

A footing that does not reach down below frost. For reference, Hennepin County is Zone II under Minnesota Rules 1303.1600, which sets a minimum footing depth of forty-two inches below finished grade absent an engineer's determination. Anything shallower lets frost get underneath, lift it a little each winter and set it back down differently. Rebuilding it on proper footings ends the cycle.

When do you pour?

March to mid-October. Early in the season, frost coming out of the ground and seasonal load restrictions on posted routes decide when a loaded ready mix truck can actually reach your street, so the first weeks are not something anybody should promise a hard date on.

Nearby

Also serving

Ready to get it poured right?

Tell us what you are planning, a patio, a driveway, a foundation or a pour you cannot reach. We will look at the site, explain what it actually needs, and give you a free written estimate.