City lots, alley garages and a curb cut process with real rules attached. Stamped patios, driveway and apron replacement, and pumped backyard pours, from a crew based in Carver.
Minneapolis is a long haul from our shop in Carver, and it is a city with a lot of written rules attached to driveway work. That is not a complaint. The city has put in writing what a drive apron has to look like and somebody comes out to check, so a homeowner here who hires carefully knows in advance what he is getting.
The city sits in Hennepin County, and the county is what sets the number that governs every footing we put in the ground here. Under Minnesota Rules 1303.1600, the state building code splits Minnesota into two frost depth zones, and Hennepin County is Zone II, where the minimum footing depth is three and a half feet, forty-two inches, below finished grade, absent an engineer's soil mechanics determination allowing a shallower depth. Northern Minnesota goes deeper. Forty-two inches is a floor, not a target to shave, and it is the depth we form footings to unless an engineer on your project has determined otherwise.
The part that surprises people is the driveway. If your project touches the public right-of-way, and a drive apron does by definition, Minneapolis requires permission from the city before the work happens. The process runs through Community Planning and Economic Development, specifically Minneapolis Development Review. You submit a plan review request, upload the existing and proposed plans to the city's ProjectDox system, and once the curb cut plan is approved you obtain a Sidewalk Inspection Permit. The city's own curb cut requirements also reference an Obstruction Permit for work that affects the right-of-way. That is three steps, and it is worth knowing all three before you plan the work.
We pour stamped patios, driveways, aprons, garage slabs, steps, walks, footings and foundation walls across the city, and we run our own line pump, which in Minneapolis is less a convenience than a requirement. On a city lot, a ready mix truck often has no route to the backyard at all.
Start with width, because it is the rule most people get wrong. The city's Curb Cut Requirements for a residential drive apron set a standard apron at a minimum of eight feet and a maximum of sixteen feet wide. There is a separate allowance where the garage door itself sits within twenty feet of the right-of-way: a single stall may go to fourteen feet, a double stall to eighteen feet, and a triple stall to twenty-two feet. If you are picturing a wider approach than that, the picture has to change before anything gets formed.
Then placement. The apron has to sit at least twenty feet from a street corner, and thirty feet if the intersection is signalized. At least five feet of straight curb has to be left between the end of the apron's curve radius and your lot line, though the city's curb cut page allows that to be reduced with the consent of the adjacent neighbor. The apron cannot come closer than five feet to a fire hydrant, a traffic signal, a streetlight, a utility pole, a tree, a vent pipe or any other fixed structure, and it needs five feet of separation from an alley or an adjacent driveway, or else a bull nose with a two and a half foot radius.
There are three construction rules worth knowing before you spend money on a design. The apron must be built perpendicular to the public right-of-way. Only one drive apron is permitted per residential property. And an apron cannot occupy a drainage depression at a storm sewer catch basin, which quietly rules out a fair number of otherwise obvious locations on a block that drains to a corner.
The rule that ends the most conversations is the alley rule. In Minneapolis, driveways from the street are not allowed for one to three unit homes that have alley access. If your garage opens onto the alley, the city's answer to a new street curb cut is no, and the work moves to where it belongs: the alley apron, the garage slab, the pad behind the house, the walk from the back door. That is a large share of what we actually pour in this city, and it is honest work that nobody photographs.
One more item that belongs in the estimate conversation rather than in the fine print. The city's curb cut requirements state that residential drive apron work is to be done by a bonded contractor carrying a fifteen thousand dollar Sidewalk Contractor's bond. That is a City of Minneapolis requirement about who may do the work, and it is worth asking every bidder about directly, including us, so that you hear the answer from the person who is going to be standing on your boulevard rather than reading it off a website.
On fees we are going to be plain. The city publishes a general permit fee schedule, but it does not state a dollar amount for a residential driveway or curb cut on the curb cut page or in the Curb Cut Requirements document. So we do not quote you one. We tell you what the process is, we walk it with you, and the city tells you what it costs for your address.
The concrete itself has its own city character. Local history sources describe a building boom concentrated in the late 1940s and through most of the 1950s that produced small one and one-and-a-half story homes on tightly repeated lots. We treat that as background rather than as a specification, but it does match what we find under a slab: driveways and walks on their second or third life, aprons that have been patched around, and surfaces that have taken decades of de-icing salt. Scaling, where the top skin of the slab flakes away, is the classic result, and it is telling you about finish and sealing history at least as much as about age.
Access is the last constraint, and in the city it is the biggest. Detached garages at the back of the lot, side yards you can walk through sideways, boulevard trees the curb cut rules require us to stay five feet clear of, alleys that are the only way in, and neighbors within arm's reach on both sides. A ready mix chute reaches none of that. Pumping is how a Minneapolis backyard patio gets poured at all, and it keeps tracked equipment off a lawn and a boulevard you would otherwise be repairing.
Stamped patios in the patterns and colors you actually want, poured with the base, jointing and sealer that keep them looking right season after season.
Learn moreNew driveways and full tear out and replacement. Proper base, proper thickness, joints cut where they belong, so it does not crack the way the last one did.
Learn moreFoundation walls, footings and frost walls for new builds, additions and garages, formed and poured to the depth Minnesota code requires.
Learn moreBackyards, basements and anywhere the truck cannot back up to. Line pumping so the pour reaches the form instead of the wheelbarrow.
Learn moreWalks, front steps, stoops and garage aprons. The small pours people put off, done with the same base work and jointing as the big ones.
Learn moreConcrete floors poured inside pole buildings and pole barns, plus the aprons in front of the doors. Compacted base, rebar throughout and saw cut joints.
Learn moreBasement floors, garage floors, slabs, sidewalks and driveways on new homes, poured to the builder's schedule by the crew that did the footings.
Learn moreCleaning, patching and a fresh coat of sealer on stamped patios, driveways and walks, so an older slab goes back to looking like the one you paid for.
Learn moreCustom poured countertops, bar tops and vanities, taken on between flatwork jobs. Call to see what the schedule looks like.
Learn moreIf the work touches the public right-of-way, which a drive apron does, yes. The city requires permission before you build or change it. The process runs through Community Planning and Economic Development, through Minneapolis Development Review: a plan review request, existing and proposed plans uploaded to ProjectDox, and then a Sidewalk Inspection Permit once the curb cut plan is approved. The city's requirements also reference an Obstruction Permit for right-of-way work.
We are not going to give you a number we cannot back up. The city publishes a general permit fee schedule, but no dollar figure for a residential driveway or curb cut appeared on the curb cut page or in the Curb Cut Requirements document when we looked. The city will tell you the amount for your address, and we will walk the submittal with you.
A standard residential drive apron runs a minimum of eight feet and a maximum of sixteen feet. If your garage door is within twenty feet of the right-of-way there is a separate allowance: fourteen feet for a single stall, eighteen for a double, twenty-two for a triple. Those are city numbers, not ours.
For a one to three unit home with alley access, no. The city does not allow street driveways in that situation. What we can do is everything on the alley side: the apron, the garage slab, a parking pad, and the walk that ties it back to the house.
At least twenty feet from a street corner, and thirty feet if that intersection is signalized. There are also five foot clearances from hydrants, streetlights, traffic signals, utility poles, trees and vent pipes, and a five foot separation from an alley or a neighboring driveway unless a bull nose is used.
The city's curb cut requirements do state that this work is to be done by a bonded contractor carrying a fifteen thousand dollar Sidewalk Contractor's bond. That is a requirement the City of Minneapolis places on the work. Ask us, and ask anyone else you are getting a number from, and get the answer directly.
Usually, and usually by pump. We run our own line pump, so concrete travels by hose down a side yard, through a gate or up an alley rather than needing a truck in the yard. On a city lot that is generally the only way a patio happens.
That is scaling. Water gets into the surface, freezes and lifts the top skin off, and de-icing salt accelerates it badly. It usually points at the original finish and the sealing history rather than at age alone, and it is one of the things we look at before quoting a replacement, because a new slab on the same tired base does the same thing again.
December through March, for the following season. We pour March to mid-October, the calendar for the season gets set over the winter, and it fills in the order it was booked.
Tell us what you are planning, a patio, a driveway, a foundation or a pour you cannot reach. We will look at the site, explain what it actually needs, and give you a free written estimate.