Service Areas

Concrete Contractor in Robbinsdale, MN

Robbinsdale writes its driveway rules into the zoning code, has a contractor licensing requirement, and has neighborhoods that were wetland within living memory. Driveways, patios, walks and foundations.

Robbinsdale is a small city with specific paperwork, and that is a good thing for a homeowner. The city publishes a Curb and Driveway Apron Permit Application issued by its Engineering Department, and the operative ordinance for this work is Section 800.23, curb cuts, driveway apron or sidewalk. The fee is one hundred twenty-five dollars.

There is a second permit that exists but usually does not apply to a driveway. A Street Excavation Permit under Section 800.05 covers other right-of-way excavation work and runs fifty dollars per utility company or one hundred twenty-five dollars for all others, per occurrence. It is distinct from the curb cut and driveway apron permit, and knowing the difference stops you from being sold the wrong one.

There is also a licensing requirement attached to who may do the work. Under Section 405.15, a contractor performing driveway cement or bituminous work in Robbinsdale is required to hold the city's annual Driveway Cement and Bituminous Contractor License, which the fee schedule lists at seventy-five dollars a year. That is a city requirement about the trade, and it is a fair and specific question to put to every contractor bidding your job, including us. Ask directly and get a direct answer rather than a logo on a truck.

Robbinsdale is in Hennepin County, so footings go a minimum of forty-two inches below finished grade, Zone II under Minnesota Rules 1303.1600, absent an engineer's soil mechanics determination allowing a shallower depth. We pour driveways, aprons, stamped patios, walks, steps, garage slabs, parking pads, footings and foundation walls here, and we run our own line pump for the backyards that a truck cannot reach.

What the zoning code says, and what was under the neighborhood first

Robbinsdale puts hard driveway numbers in its municipal code rather than leaving them to an engineering counter. A driveway serving four or fewer parking spaces has to be a minimum of ten feet wide. That is a minimum, not a maximum, and the distinction is worth catching, because it is easy to read a code excerpt backwards and design to the wrong constraint.

There is a parking setback that catches people out. No off-street parking is allowed within fifteen feet of any street right-of-way in a residentially zoned district, measured from the property line. If your plan is a driveway plus a parking pad near the front of the lot, that fifteen feet is the number the plan has to respect, and it is better to redraw a layout on paper than to pour it and be told to take it out.

On spacing, driveway access curb openings on a public street have to be at least twenty-five feet apart, with single and two family dwellings excepted from that requirement. So on a typical Robbinsdale house the spacing rule is not what governs, but on anything above two units it is.

The surfacing rule is the one we quote most often. New construction driveways in the R-1 and R-2 districts have to be surfaced with blacktop, concrete or another hard surface material approved by the city. Existing residential driveways have to use a material suitable to control dust and drainage, and grass surfacing is explicitly prohibited. If you have been parking on a worn gravel or turf strip alongside the house and wondering whether you have to do something about it, that is the code language that answers it.

Now the part of Robbinsdale that shows up in the ground rather than in the code book. The Robbinsdale Historical Society records a 1950 census population of 11,289, an 87.6 percent increase since 1940, and describes a city council adjusting ward boundaries in April 1950 because wards were being reduced in size by the number of new homes going up, with the school district jammed by rising registrations that fall. That is a historical society's account rather than a government statistical source, so we treat the numbers as their record. What is not in dispute is the census figure: the city's population rose 87.6 percent in a single decade, with the homes to match going up fast.

The same source notes that the Robin Center and Terrace and Wards areas were still swamps as of 1950, meaning those neighborhoods were developed later in that decade. We are not going to tell you what the soil is under your house, because no credible source states a citywide soil type or drainage characteristic for Robbinsdale and we do not guess about the ground. What we will say is that in a city where some neighborhoods were low, wet ground within living memory and were built later than their neighbors, what is under an old slab is a question we answer by digging rather than by assuming. We dig, we look, and we tell you.

Practically, that shapes how we quote replacements here. A driveway that has cracked through, tipped at the panels or crumbled at the apron is rarely a concrete problem. It is a base problem or a jointing problem wearing a concrete costume. So we take the slab out, look at what it was sitting on, correct the subgrade, build an aggregate base up in lifts rather than dumping it in one pass, pour at honest thickness, and saw cut the joints on time and to depth in panels close to square. That sequence is what stops the same failure from repeating on a new slab.

Access here is a planning problem as much as a pouring one, and we look at the route to the back before we look at anything else. Detached garages at the back, tight side yards, mature trees, neighbors near the property line. Our own line pump is how a backyard patio gets poured behind a Robbinsdale house without a truck on the lawn, and it is how the tear out and the pour both stay inside your property line instead of spilling across a neighbor's.

What we pour in Robbinsdale

  • Driveway and apron replacement under the Section 800.23 curb and driveway apron permit
  • Hard surface replacement for worn gravel or turf parking strips, which the code does not allow to stay grass
  • Parking pads laid out to respect the fifteen foot residential parking setback from the right-of-way
  • Stamped patios and sitting areas placed by pump in tight backyards
  • Detached garage slabs, aprons and the walk that ties them to the house
  • Footings and frost walls at forty-two inches for garages, additions and outbuildings
  • Front walks, steps and stoops rebuilt on footings rather than reset on the old pad
  • Full tear out, haul away, base correction and broom or exposed aggregate finish
Robbinsdale questions

Good to know

What permit do I need for a driveway in Robbinsdale?

The Curb and Driveway Apron Permit, issued by the city's Engineering Department under Ordinance Code Section 800.23. The fee is one hundred twenty-five dollars.

What is the street excavation permit then?

A different thing. Section 800.05 covers other right-of-way excavation work at fifty dollars per utility company or one hundred twenty-five dollars for all others per occurrence. It is separate from the curb cut and driveway apron permit and it is not usually what a residential driveway needs.

Does my contractor need a city license?

Robbinsdale requires that a contractor performing driveway cement or bituminous work hold the city's annual Driveway Cement and Bituminous Contractor License under Section 405.15, listed at seventy-five dollars a year on the fee schedule. That is a city rule about the trade. Ask us about it directly, and ask everyone else you are getting a number from.

Is there a minimum driveway width?

Yes. A driveway serving four or fewer parking spaces must be at least ten feet wide under the city code. Note that it is a minimum, not a maximum.

Can I put a parking pad near the front of my lot?

Not within fifteen feet of the street right-of-way, measured from the property line, in a residentially zoned district. That is a code limit on off-street parking and it decides a lot of layouts here before anything gets poured.

I park on gravel next to the house. Is that allowed?

New construction driveways in R-1 and R-2 have to be blacktop, concrete or another hard surface approved by the city. Existing residential driveways have to use a material suitable to control dust and drainage, and grass surfacing is specifically prohibited. If yours has worn back to turf, that is worth addressing.

What is the ground like under my driveway?

We do not know until we open it up, and we will not pretend otherwise. No credible source states a citywide soil type for Robbinsdale. What we do know is that this city built out fast in one decade and that some neighborhoods were low, wet ground before they were neighborhoods, so we open it up and look rather than guess. That is a reason to look rather than a reason to worry.

Can you pour a patio in a small backyard with no side access?

Yes, by pump. We run our own line pump, so the mixer truck stays at the street and the concrete goes down a narrow route or through a gate by hose. On lots this size that is the normal way it happens.

How deep do footings go?

Forty-two inches below finished grade, Hennepin County being Zone II under Minnesota Rules 1303.1600, which sets that minimum absent an engineer's soil mechanics determination allowing a shallower depth.

Ready to get it poured right?

Tell us what you are planning, a patio, a driveway, a foundation or a pour you cannot reach. We will look at the site, explain what it actually needs, and give you a free written estimate.